How to Pour an Elevated Concrete Slab
- 1). Build the supporting walls according to the structural plans. They can either be constructed out of concrete blockwork, or by concrete poured into formwork and reinforced with steel bars. Also build the wall that supports the floor to the specific designs as shown on your plans and blueprints.
- 2). Lower the metal slab pan into place with a tower crane. This will be used as the formwork into which the concrete will be poured to form the elevated floor. Alternatively, you can use a system of connecting preformed concrete panels.
- 3). Lay the reinforced steel mesh into the pan before pouring the concrete, lifting it slightly from the floor of the pan using small metal supports --- or "chairs" --- at regular intervals. This gives additional strength to the floor. Larger buildings may require the use of precast concrete floors that have been previously reinforced with tensile steel bars.
- 4). Pour the concrete into the pan, making sure that the mix made according the structural engineers' recommendations.
- 5). Leave the floor for 48 hours to completely cure before walking on it.